Click here for Adobe Acrobat version
Click here for Microsoft Word version
********************************************************
NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Federal Communications Commission DA 18-194
Before the
Federal Communications Commission
Washington, DC 20554
In the Matter of
Mobilitie, LLC
)
)
)
)
)
File No.: EB-SED-17-00024244
Acct. No.: 201832100005
FRN: 0025628553
ORDER
Adopted: April 10, 2018 Released: April 10, 2018
By the Acting Deputy Chief, Enforcement Bureau:
1. The Enforcement Bureau (Bureau) of the Federal Communications Commission has
entered into a Consent Decree to resolve the Bureau’s investigation into allegations that Mobilitie, LLC,
(Mobilitie) failed to comply with the Commission’s wireless infrastructure rules in effect during the
investigation, including rules implementing the National Environmental Policy Act of 1969 (NEPA) and
the National Historic Preservation Act (NHPA).
1
The Consent Decree also resolves the Bureau’s
investigation into whether Mobilitie commenced construction of certain towers prior to registering the
structures with the Commission. To implement NEPA and Section 106 of the NHPA, the Commission’s
rules require that current and prospective licensees and tower registrants assess certain types of proposed
facilities, prior to the start of any construction, to determine the potential for a significant impact on the
environment or historic properties.
2
Commission rules also direct these entities to coordinate with
relevant State governments and Tribal Nations. These requirements promote the nationwide deployment
of wireless facilities while balancing such deployments against other important federal, state, and
sovereign Tribal interests. Entities that unilaterally choose to begin construction of wireless facilities
prior to completing a Commission required environmental and historic preservation review violate federal
law and show contempt for the respective jurisdictional authorities.
2. To settle this matter, Mobilitie will implement a robust compliance plan to ensure that it
does not violate the Commission’s environmental and historic preservation rules in the future, and pay a
$1,600,000 settlement amount.
3. After reviewing the terms of the Consent Decree and evaluating the facts before us, we
find that the public interest would be served by adopting the Consent Decree and terminating the
referenced investigation regarding Mobilitie’s compliance with environmental protection and historic
preservation requirements found in NEPA and NHPA, and Sections 1.1307, 1.1312, and 17.4 of the
Commission’s rules.
3
4. In the absence of material new evidence relating to this matter, we do not set for hearing
the question of Mobilitie’s basic qualifications to hold or obtain any Commission license or
authorization.
4
1
See National Environmental Policy Act of 1969, Pub. L. No. 91-190, 83 Stat. 852 (1970) (codified as amended at
42 U.S.C. § 4321 et seq.) (NEPA); National Historic Preservation Act, Pub. L. No. 89-665, 80 Stat. 915 (1966)
(codified as amended at 54 U.S.C. § 300101 et seq.) (NHPA).
2
See 47 CFR § 1.1301 et seq.
3
47 CFR §§ 1.1307, 1.1312, 17.4.
4
See 47 CFR § 1.93(b).
Federal Communications Commission DA 18-194
2
5. Accordingly, IT IS ORDERED that, pursuant to Section 4(i) of the Act
5
and the
authority delegated by Sections 0.111 and 0.311 of the Commission’s rules,
6
the attached Consent Decree
IS ADOPTED and its terms incorporated by reference.
6. IT IS FURTHER ORDERED that the above-captioned matter IS TERMINATED in
accordance with the terms of the attached Consent Decree.
7. IT IS FURTHER ORDERED that a copy of this Order and Consent Decree shall be
sent by first class mail and certified mail, return receipt requested, to Christopher Glass, General Counsel,
Mobilitie, LLC, 660 Newport Center Drive, Suite 200, Newport Beach, CA 92660, and to David H.
Solomon, Counsel for Mobilitie, LLC, 1800 M Street, NW, Suite 800N, Washington, DC 20036.
FEDERAL COMMUNICATIONS COMMISSION
Christopher L. Killion
Acting Deputy Chief
Enforcement Bureau
5
47 U.S.C. § 154(i).
6
47 CFR §§ 0.111, 0.311.
Federal Communications Commission DA 18-194
Before the
Federal Communications Commission
Washington, DC 20554
In the Matter of
Mobilitie, LLC
)
)
)
)
)
File No.: EB-SED-17-00024244
Acct. No.: 201832100005
FRN: 0025628553
CONSENT DECREE
1. The Enforcement Bureau of the Federal Communications Commission and Mobilitie,
LLC, by their authorized representatives, hereby enter into this Consent Decree for the purpose of
terminating the Enforcement Bureau’s investigation into whether Mobilitie, LLC violated Sections 1.1307
and 1.1312 of the Commission’s rules
7
pertaining to the required assessment of the potential effect on the
environment of the construction of wireless communications facilities, and Section 17.4 of the
Commission’s rules regarding registration of certain antenna structures with the Commission’s antenna
structure registration system.
8
I. DEFINITIONS
2. For the purposes of this Consent Decree, the following definitions shall apply:
(a) “Act” means the Communications Act of 1934, as amended.
9
(b) “Adopting Order” means an order of the Bureau adopting the terms of this Consent
Decree without change, addition, deletion, or modification.
(c) “Bureau” means the Enforcement Bureau of the Federal Communications
Commission.
(d) “Commission” and “FCC” mean the Federal Communications Commission and all
of its bureaus and offices.
(e) “Communications Laws” means collectively, the Act, the Rules, and the published
and promulgated orders and decisions of the Commission to which Mobilitie is
subject by virtue of its business activities, including but not limited to the Wireless
Infrastructure Rules.
(f) “Compliance Plan” means the compliance obligations, program, and procedures
described in this Consent Decree at paragraph 13.
(g) “Covered Employees” means all employees, agents, and contractors of Mobilitie
who perform, or supervise, oversee, or manage the performance of, duties that relate
to Mobilitie’s responsibilities under the Wireless Infrastructure Rules.
(h) “Effective Date” means the date by which both the Bureau and Mobilitie have
signed the Consent Decree.
7
47 CFR §§ 1.1307, 1.1312.
8
47 CFR § 17.4.
9
47 U.S.C. § 151 et seq.
Federal Communications Commission DA 18-194
2
(i) “Wireless Infrastructure Rules” means Section 303(q) of the Act, Section 17.4 of the
Rules,
10
other provisions of the Communications Laws related to the registration of
certain antenna structures according to Federal Aviation Administration and
Commission specifications, and Section 1.1301, et seq., of the Rules and other
Communications Laws implementing the National Environmental Policy Act of
1969, as amended, (NEPA)
11
and the National Historic Preservation Act, as
amended (NHPA).
12
(j) “Investigation” means the investigation commenced by the Bureau in EB-SED-17-
00024244 regarding whether Mobilitie violated the Wireless Infrastructure Rules.
(k) “Mobilitie” or “Company” means Mobilitie, LLC and its affiliates, subsidiaries,
predecessors-in-interest, and successors-in-interest.
(l) “Operating Procedures” means the standard internal operating procedures and
compliance policies established by Mobilitie to implement the Compliance Plan.
(m) “Parties” means Mobilitie and the Bureau, each of which is a “Party.”
(n) “Rules” means the Commission’s regulations found in Title 47 of the Code of
Federal Regulations.
II. BACKGROUND
3. Under the Commission’s Wireless Infrastructure Rules, applicants and licensees are
required to assess whether certain proposed facilities may significantly affect the environment, as defined
in Section 1.1307 of the Rules. This obligation expressly applies to certain facilities for which no
preconstruction authorization is required.
13
Section 1.1307(a) addresses facilities that may affect
threatened or endangered species or their critical habitats, or are likely to jeopardize proposed threatened
or endangered species or destroy or adversely modify proposed critical habitats; that may affect districts,
sites, buildings, structures or objects that are listed, or eligible for listing, in the National Register; that
may affect Native American religious sites; that will involve significant change in surface features; or that
will be located in residential neighborhoods and will be equipped with high intensity white lights.
14
In
considering potential effects on historic properties, Section 1.1307(a)(4) requires applicants to follow the
prescribed procedures set forth in the rules of the Advisory Council on Historic Preservation (Advisory
Council),
15
as modified by the Nationwide Programmatic Agreement for the Collocation of Wireless
Antennas (Collocation Agreement)
16
and the Nationwide Programmatic Agreement Regarding the Section
10
47 U.S.C. § 303(q); 47 CFR § 17.4.
11
National Environmental Policy Act of 1969, Pub. L. No. 91-190, 83 Stat. 852 (1970) (codified as amended at 42
U.S.C. § 4321 et seq.) (NEPA).
12
National Historic Preservation Act, Pub. L. No. 89-665, 80 Stat. 915 (1966) (codified as amended at 54 U.S.C. §
300101 et seq.) (NHPA).
13
See 47 CFR § 1.1312(a).
14
Id. § 1.1307(a). National Register refers to the National Register of Historic Places, which is maintained by the
Secretary of the Interior’s office of the Keeper of the National Register. 47 CFR Pt. 1, App. C, Section II. A. 10.
15
36 CFR Pt. 800.
16
47 CFR Pt. 1, App. B. See Wireless Telecommunications Bureau Announces Execution of Programmatic
Agreement with respect to Collocating Wireless Antennas on Existing Structures, Public Notice, 16 FCC Rcd 5574
(WTB 2001), recon. denied, 20 FCC Rcd 4084 (WTB 2005).
Federal Communications Commission DA 18-194
3
106 National Historic Preservation Act Review Process (NPA).
17
These agreements tailor and streamline
the review and consultation procedures routinely required by the NHPA
18
and the implementing
regulations issued by the Advisory Council. Additionally, Section 17.4 of the Rules requires that the
owner of any existing or proposed antenna structure, which requires notice of construction to the Federal
Aviation Administration, register the structure with the Commission.
19
Applicants and licensees that do
not adhere to these regulations potentially jeopardize sensitive environmental areas and invaluable
cultural, historic, and religious sites. Additionally, an applicant or licensee’s failure to strictly adhere to
the rules means that the Commission does not fulfill its obligation under NEPA to ensure that the effect of
its licensing or approval of wireless infrastructure does not cause a significant adverse impact on the
environment.
20
4. Mobilitie, LLC is a privately held, non-licensed entity that constructs, owns, and leases
wireless infrastructure for carriers across the United States. The company holds more than a dozen
competitive local exchange carrier registrations and holds authorizations from state public utility
commissions. Mobilitie typically deploys wireless infrastructure along rights of way, including small
cells, communications towers, indoor and outdoor neutral host systems, and Wi-Fi networks. Mobilitie
entered into a contractual arrangement with a wireless carrier to construct thousands of small cells,
monopoles, and other wireless facilities for the purpose of densifying the carrier’s network.
5. On May 9, 2017, the Bureau’s Spectrum Enforcement Division issued a Letter of Inquiry
to Mobilitie, directing Mobilitie to submit a sworn written response to a series of questions relating to
Mobilitie’s compliance with the Commission’s environmental review process under NEPA and the
Commission’s historic preservation review process under Section 106 of NHPA. Mobilitie filed
responses on June 15, 2017, October 12, 2017, November 13, 2017, January 3, 2018, and February 1,
2018. The Bureau and Mobilitie entered into Tolling Agreements to toll the statute of limitations, and
negotiated the terms of the Consent Decree. The Investigation revealed that, in an effort to meet certain
deadlines, Mobilitie had commenced construction of certain wireless facilities without securing all
necessary regulatory and environmental approvals required under the Commission’s Wireless
17
47 CFR Pt. 1, App. C. See Nationwide Programmatic Agreement Regarding the Section 106 National Historic
Preservation Act Review Process, Report and Order, 20 FCC Rcd 1073 (2004), clarified, 20 FCC Rcd 17995 (2005),
aff’d, CTIA-The Wireless Ass’n. v. FCC, 466 F.3d 105 (D.C. Cir. 2006) (NPA Report and Order).
18
54 U.S.C. § 300101 et seq. The NHPA requires that a federal agency consider the effects of its federal
undertakings, including actions that it authorizes or approves, on historic properties prior to issuing federal licenses,
permits, or approvals. See 54 U.S.C. §§ 306108, 300320. This review is commonly referred to as “Section 106
Review” because the provision requiring the review was originally enacted as Section 106 of the NHPA. In
considering such effects, the NHPA further requires the federal agency to consider the views of expert agencies.
Specifically, the NHPA requires the federal agency to consider the views of the Advisory Council, which is the
federal agency responsible for implementing the NHPA; the appropriate State Historic Preservation Officer; and, if
historic properties of religious or cultural significance to federally recognized Tribal Nations or Native Hawaiian
organizations may be affected, their representatives. See 54 U.S.C. §§ 302104, 302706, 306108, 304101. As
authorized by the Advisory Council, the Commission’s environmental rules delegate to its licensees, permittees, and
applicants initial responsibility for identifying historic properties and evaluating the effects that their proposed
facilities may have on such properties, but the Commission remains ultimately responsible for ensuring that the
Section 106 process occurs in accordance with applicable statutory and regulatory provisions, as well as for
government-to-government consultation with federally recognized Tribal Nations. See 47 CFR § 1.1307(a)(4); see
also 36 CFR § 800.2(a)(3); NPA Report and Order, 20 FCC Rcd at 1076-77, para. 5.
19
See 47 CFR § 17.4.
20
Nationwide Programmatic Agreement Regarding the Section 106 National Historic Preservation Act Review
Process, Report and Order, 20 FCC Rcd 1073, 1084, para. 27 (2004), aff'd sub nom., CTIA-Wireless Ass’n v. FCC,
466 F.3d 105 (2006) (explaining that the Commission's treatment of tower registrations as federal undertakings
within the meaning of Section 106 of the National Historic Preservation Act, 16 U.S.C. § 470f, is a permissible
interpretation in light of the required preconstruction approval process).
Federal Communications Commission DA 18-194
4
Infrastructure Rules. Specifically, prior to construction, Mobilitie did not timely complete registration of
certain antenna structures with the Commission as required under Section 17.4 of the Rules and did not
complete the environmental and/or historic preservation review process set forth in Section 1.1307(a) of
the Rules.
6. To settle this Investigation, Mobilitie has agreed to pay a one million six hundred
thousand dollar ($1,600,000) settlement amount to the United States Treasury. Additionally, Mobilitie
has agreed to enhance its environmental and historic property review compliance procedures by
reviewing and updating, as necessary, its existing compliance guidelines, by training all current and new
Covered Employees on the current requirements, by requiring Covered Employees to report to
management instances of noncompliance with the Wireless Infrastructure Rules, and by self-reporting any
apparent violations to the Bureau until the end of the compliance period.
III. TERMS OF AGREEMENT
7. Adopting Order. The provisions of this Consent Decree shall be incorporated by the
Bureau in an Adopting Order.
8. Jurisdiction. Mobilitie agrees that the Bureau has jurisdiction over it and the matters
contained in this Consent Decree and has the authority to enter into and adopt this Consent Decree.
9. Effective Date; Violations. The Parties agree that this Consent Decree shall become
effective on the Effective Date as defined herein. As of the Effective Date, the Parties agree that this
Consent Decree shall have the same force and effect as any other order of the Commission.
10. Termination of Investigation. In express reliance on the covenants and representations
in this Consent Decree and to avoid further expenditure of public resources, the Bureau agrees to
terminate the Investigation. In consideration for the termination of the Investigation, Mobilitie agrees to
the terms, conditions, and procedures contained herein. The Bureau further agrees that, in the absence of
new material evidence, it will not use the facts developed in the Investigation through the Effective Date,
or the existence of this Consent Decree, to institute, on its own motion, any new proceeding, formal or
informal, or take any action on its own motion against Mobilitie concerning the matters that were the
subject of the Investigation. The Bureau also agrees that, in the absence of new material evidence, it will
not use the facts developed in the Investigation through the Effective Date, or the existence of this
Consent Decree, to institute on its own motion any proceeding, formal or informal, or to set for hearing
the question of Mobilitie’s basic qualifications to be a Commission licensee or hold Commission licenses
or authorizations.
21
11. Representations and Warranties. Mobilitie agrees that it will not treat any payment of
the Settlement Amount described below in paragraph 17 as tax deductible for purposes of federal, state, or
local law.
12. Compliance Officer. Within thirty (30) calendar days after the Effective Date, Mobilitie
shall designate a senior corporate manager with the requisite corporate and organizational authority to
serve as a Compliance Officer and to discharge the duties set forth below. The person designated as the
Compliance Officer shall be responsible for developing, implementing, and administering the Compliance
Plan and ensuring that Mobilitie complies with the terms and conditions of the Compliance Plan and this
Consent Decree. In addition to the general knowledge of the Communications Laws necessary to
discharge his or her duties under this Consent Decree, the Compliance Officer shall have specific
knowledge of the Wireless Infrastructure Rules prior to assuming his/her duties.
13. Compliance Plan. For purposes of settling the matters set forth herein, Mobilitie agrees
that it shall, within sixty (60) calendar days after the Effective Date, develop and implement a
Compliance Plan designed to ensure future compliance with the Wireless Infrastructure Rules and with
21
See 47 CFR § 1.93(b).
Federal Communications Commission DA 18-194
5
the terms and conditions of this Consent Decree. Such Compliance Plan must include, at a minimum, the
following procedures:
(a) Operating Procedures on Wireless Infrastructure Rules. Within sixty (60)
calendar days after the Effective Date, Mobilitie shall establish Operating
Procedures that all Covered Employees must follow to help ensure Mobilitie’s
compliance with the Wireless Infrastructure Rules.
i. Mobilitie’s Operating Procedures shall include internal procedures and
policies specifically designed to ensure that Mobilitie performs the required
review of the potential effects on the environment of any proposed facilities,
including facilities for which no preconstruction authorization is required.
ii. Mobilitie’s Operating Procedures shall incorporate a Compliance Checklist
that describes the steps that a Covered Employee must follow to determine
whether construction of the proposed facility is within the scope of our
Wireless Infrastructure Rules, is categorically excluded from environmental
processing under Section 1.1306 of the Rules,
22
or may have a significant
environmental effect, as defined in Section 1.1307 of the Rules.
23
iii. Mobilitie’s Operating Procedures shall include internal procedures and
policies specifically designed to ensure that Mobilitie performs the required
review to ensure compliance with the antenna structure registration
requirements.
(b) Compliance Manual. Within sixty (60) calendar days after the Effective Date, the
Compliance Officer shall develop and distribute a Compliance Manual to all
Covered Employees. The Compliance Manual shall explain the Wireless
Infrastructure Rules and set forth the Operating Procedures that Covered Employees
shall follow to help ensure Mobilitie’s compliance with the Wireless Infrastructure
Rules. Mobilitie shall periodically review and revise the Compliance Manual as
necessary to ensure that the information set forth therein remains current and
accurate. Mobilitie shall distribute any revisions to the Compliance Manual
promptly to all Covered Employees. With respect to third parties that employ
Covered Employees, Mobilitie shall: (i) distribute the Compliance Manual to each
such third party and instruct the third party to distribute the Compliance Manual to
each such Covered Employee; and (ii) distribute any revisions to the Compliance
Manual to each such third party and instruct the third party to distribute the revisions
to the Compliance Manual to each such Covered Employee.
(c) Compliance Training Program. Mobilitie shall establish and implement a
Compliance Training Program on compliance with the Wireless Infrastructure Rules
and the Operating Procedures. As part of the Compliance Training Program,
Covered Employees shall be advised of Mobilitie’s obligation to report any
noncompliance with the Wireless Infrastructure Rules under paragraph 14 of this
Consent Decree and shall be instructed on how to disclose noncompliance to the
Compliance Officer. All Covered Employees employed by Mobilitie shall be
trained pursuant to the Compliance Training Program within ninety (90) calendar
days after the Effective Date, except that any person who becomes a Covered
Employee employed by Mobilitie at any time after the initial Compliance Training
Program shall be trained within thirty (30) calendar days after the date such person
22
47 CFR § 1.1306.
23
Id. § 1.1307.
Federal Communications Commission DA 18-194
6
becomes a Covered Employee. Mobilitie shall repeat compliance training on an
annual basis, and shall periodically review and revise the Compliance Training
Program as necessary to ensure that it remains current and complete and to enhance
its effectiveness. With respect to third parties that employ Covered Employees,
Mobilitie shall instruct such third party to ensure that each such Covered Employee
receives training in accordance with the Compliance Training Program.
14. Reporting Noncompliance. Mobilitie shall report any noncompliance with the Wireless
Infrastructure Rules and with the terms and conditions of this Consent Decree within fifteen (15) calendar
days after discovery of such noncompliance. Such reports shall include a detailed explanation of:
(i) each instance of noncompliance; (ii) the steps that Mobilitie has taken or will take to remedy such
noncompliance; (iii) the schedule on which such remedial actions will be taken; and (iv) the steps that
Mobilitie has taken or will take to prevent the recurrence of any such noncompliance. All reports of
noncompliance shall be submitted to Kevin Pittman at kevin.pittman@fcc.gov and JoAnn Lucanik at
JoAnn.Lucanik@fcc.gov, with a copy submitted electronically to EB-SED-Response@fcc.gov.
15. Compliance Reports. Mobilitie shall file compliance reports with the Commission
ninety (90) calendar days after the Effective Date, twelve (12) months after the Effective Date, twenty-
four (24) months after the Effective Date, and thirty-six (36) months after the Effective Date.
(a) Each Compliance Report shall include a detailed description of Mobilitie’s efforts
during the relevant period to comply with the terms and conditions of this Consent
Decree and the Wireless Infrastructure Rules. In addition, each Compliance Report
shall include a certification by the Compliance Officer, as an agent of and on behalf
of Mobilitie, stating that the Compliance Officer has personal knowledge that
Mobilitie: (i) has established and implemented the Compliance Plan; (ii) has
utilized the Operating Procedures since the implementation of the Compliance Plan;
(iii) has not entered into business arrangements to bypass regulatory approval
processes; and (iv) is not aware of any instances of noncompliance with the terms
and conditions of this Consent Decree, including the reporting obligations set forth
in paragraph 14 of this Consent Decree.
(b) The Compliance Officer’s certification shall be accompanied by a statement
explaining the basis for such certification and shall comply with Section 1.16 of the
Rules and be subscribed to as true under penalty of perjury in substantially the form
set forth therein.
24
(c) If the Compliance Officer cannot provide the requisite certification, the Compliance
Officer, as an agent of and on behalf of Mobilitie, shall provide the Commission
with a detailed explanation of the reason(s) why and describe fully: (i) each
instance of noncompliance; (ii) the steps that Mobilitie has taken or will take to
remedy such noncompliance, including the schedule on which proposed remedial
actions will be taken; and (iii) the steps that Mobilitie has taken or will take to
prevent the recurrence of any such noncompliance, including the schedule on which
such preventive action will be taken.
(d) All Compliance Reports shall be submitted to Kevin Pittman at
Kevin.Pittman@fcc.gov and JoAnn Lucanik at JoAnn.Lucanik@fcc.gov, with a
copy submitted electronically to EB-SED-Response@fcc.gov.
16. Termination Date. Unless stated otherwise, the requirements set forth in paragraphs 12
through 15 of this Consent Decree shall expire thirty-six (36) months after the Effective Date.
24
47 CFR § 1.16.
Federal Communications Commission DA 18-194
7
17. Settlement Amount. Mobilitie will pay a settlement amount to the United States
Treasury in the amount of one million six hundred thousand dollars ($1,600,000) within thirty (30)
calendar days of the Effective Date. Mobilitie shall send electronic notification of payment to Kevin
Pittman at Kevin.Pittman@fcc.gov and to SED’s mailbox at EB-SED-Response@fcc.gov on the date said
payment is made. The payment must be made by check or similar instrument, wire transfer, or credit
card, and must include the Account Number and FRN referenced above. Regardless of the form of
payment, a completed FCC Form 159 (Remittance Advice) must be submitted.
25
When completing the
FCC Form 159, enter the Account Number in block number 23A (call sign/other ID) and enter the letters
“FORF” in block number 24A (payment type code). Below are additional instructions that should be
followed based on the form of payment selected:
? Payment by check or money order must be made payable to the order of the Federal
Communications Commission. Such payments (along with the completed Form 159) must be
mailed to Federal Communications Commission, P.O. Box 979088, St. Louis, MO 63197-
9000, or sent via overnight mail to U.S. Bank – Government Lockbox #979088,
SL-MO-C2-GL, 1005 Convention Plaza, St. Louis, MO 63101.
? Payment by wire transfer must be made to ABA Number 021030004, receiving bank
TREAS/NYC, and Account Number 27000001. To complete the wire transfer and ensure
appropriate crediting of the wired funds, a completed Form 159 must be faxed to U.S. Bank
at (314) 418-4232 on the same business day the wire transfer is initiated.
? Payment by credit card must be made by providing the required credit card information on
FCC Form 159 and signing and dating the Form 159 to authorize the credit card payment.
The completed Form 159 must then be mailed to Federal Communications Commission, P.O.
Box 979088, St. Louis, MO 63197-9000, or sent via overnight mail to U.S. Bank –
Government Lockbox #979088, SL-MO-C2-GL, 1005 Convention Plaza, St. Louis, MO
63101.
Questions regarding payment procedures should be addressed to the Financial Operations Group Help
Desk by phone, 1-877-480-3201, or by e-mail, ARINQUIRIES@fcc.gov.
18. Waivers. As of the Effective Date, Mobilitie waives any and all rights it may have to
seek administrative or judicial reconsideration, review, appeal or stay, or to otherwise challenge or contest
the validity of this Consent Decree and the Adopting Order. Mobilitie shall retain the right to challenge
Commission interpretation of the Consent Decree or any terms contained herein. If either Party (or the
United States on behalf of the Commission) brings a judicial action to enforce the terms of the Consent
Decree or the Adopting Order, neither Mobilitie nor the Commission shall contest the validity of the
Consent Decree or the Adopting Order, and Mobilitie shall waive any statutory right to a trial de novo.
Mobilitie hereby agrees to waive any claims it may otherwise have under the Equal Access to Justice
Act
26
relating to the matters addressed in this Consent Decree.
19. Severability. The Parties agree that if any of the provisions of the Consent Decree shall
be held unenforceable by any court of competent jurisdiction, such unenforceability shall not render
unenforceable the entire Consent Decree, but rather the entire Consent Decree shall be construed as if not
containing the particular unenforceable provision or provisions, and the rights and obligations of the
Parties shall be construed and enforced accordingly.
20. Invalidity. In the event that this Consent Decree in its entirety is rendered invalid by any
court of competent jurisdiction, it shall become null and void and may not be used in any manner in any
25
An FCC Form 159 and detailed instructions for completing the form may be obtained at
http://www.fcc.gov/Forms/Form159/159.pdf.
26
See 5 U.S.C. § 504; 47 CFR §§ 1.1501–1.1530.
Federal Communications Commission DA 18-194
8
legal proceeding.
21. Subsequent Rule or Order. The Parties agree that if any provision of the Consent
Decree conflicts with any subsequent Rule or Order adopted by the Commission (except an Order
specifically intended to revise the terms of this Consent Decree to which Mobilitie does not expressly
consent) that provision will be superseded by such Rule or Order.
22. Successors and Assigns. Mobilitie agrees that the provisions of this Consent Decree
shall be binding on its successors, assigns, and transferees.
23. Final Settlement. The Parties agree and acknowledge that this Consent Decree shall
constitute a final settlement between the Parties with respect to the Investigation. The Parties further
agree that this Consent Decree does not constitute either an adjudication on the merits or a legal finding or
determination regarding any compliance or noncompliance with the Communications Laws with regards
to the matters described in paragraphs 3-6.
24. Modifications. This Consent Decree cannot be modified without the advance written
consent of both Parties.
25. Paragraph Headings. The headings of the paragraphs in this Consent Decree are
inserted for convenience only and are not intended to affect the meaning or interpretation of this Consent
Decree.
26. Authorized Representative. Each Party represents and warrants to the other that it has
full power and authority to enter into this Consent Decree. Each person signing this Consent Decree on
behalf of a Party hereby represents that he or she is fully authorized by the Party to execute this Consent
Decree and to bind the Party to its terms and conditions.
27. Counterparts. This Consent Decree may be signed in counterpart (including
electronically or by facsimile). Each counterpart, when executed and delivered, shall be an original, and
all of the counterparts together shall constitute one and the same fully executed instrument.
________________________________
Christopher L. Killion
Acting Deputy Chief
Enforcement Bureau
________________________________
Date
________________________________
Christopher Glass
Senior Vice President and General Counsel
Mobilitie, LLC
________________________________
Date