Click here for Adobe Acrobat version
Click here for Microsoft Word version

******************************************************** 
                      NOTICE
********************************************************

This document was converted from Microsoft Word.

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************



                                   Before the

                       Federal Communications Commission

                             Washington, D.C. 20554


                                  )                            
                                                               
                                  )   File No.: EB-10-MA-0012  
     In the Matter of                                          
                                  )   Acct. No.: 201132600001  
     NewCom International, Inc.                                
                                  )   FRN: 0010802528          
                                                               
                                  )                            


                                     ORDER

   Adopted: January 21, 2011 Released: January 21, 2011

   By the Chief, Enforcement Bureau:

    1. In this Order, we adopt the attached Consent Decree entered into
       between the Enforcement Bureau ("Bureau") of the Federal
       Communications Commission ("FCC" or "Commission") and NewCom
       International, Inc. ("NewCom" or "Company"). The Consent Decree
       terminates an investigation by the Bureau against NewCom for possible
       violations of Sections 25.271, 25.272, and 25.273 of the Commission's
       rules ("Rules") regarding NewCom's apparent interference with a
       licensed satellite communications system.

    2. The Bureau and NewCom have negotiated the terms of the Consent Decree
       that resolves this matter. A copy of the Consent Decree is attached
       hereto and incorporated by reference.

    3. After reviewing the terms of the Consent Decree and evaluating the
       facts before us, we find that the public interest would be served by
       adopting the Consent Decree and terminating the investigation.

    4. In the absence of material new evidence relating to this matter, we
       conclude that our investigation raises no substantial or material
       questions of fact as to whether NewCom possesses the basic
       qualifications, including those related to character, to hold or
       obtain any Commission license or authorization.

    5. Accordingly, IT IS ORDERED that, pursuant to Sections 4(i) and 503(b)
       of the Communications Act of 1934, as amended, and Sections 0.111 and
       0.311 of the Rules, the Consent Decree attached to this Order IS
       ADOPTED.

    6. IT IS FURTHER ORDERED that a copy of this Order and Consent Decree
       shall be sent by both first class and certified mail, return receipt
       requested, to NewCom International, Inc. at 15590 NW 15th Ave., Miami,
       FL 33169 and to its counsel, Frank G. Lamancusa, Bingham McCutchen
       LLP, 2020 K Street NW, Washington, DC 20006-1806.

    7. IT IS FURTHER ORDERED that the above-captioned investigation IS
       TERMINATED.

   FEDERAL COMMUNICATIONS COMMISSION

   P. Michele Ellison

   Chief, Enforcement Bureau

                                   Before the

                       Federal Communications Commission

                             Washington, D.C. 20554


                                  )                            
                                                               
                                  )                            
                                      File No.: EB-10-MA-0012  
     In the Matter of             )                            
                                      Acct. No.: 201132600001  
     NewCom International, Inc.   )                            
                                      FRN No.: 0010802528      
                                  )                            
                                                               
                                  )                            


                                 CONSENT DECREE

    8. The Enforcement Bureau and NewCom International, Inc., by their
       authorized representatives, hereby enter into this Consent Decree for
       the purpose of terminating the Enforcement Bureau's investigation
       against NewCom International, Inc. for possible violations of sections
       25.271, 25.272, and 25.273 of the Commission's rules regarding
       NewCom's apparent interference with a licensed satellite
       communications system.

   DEFINITIONS

    9. For the purposes of this Consent Decree, the following definitions
       shall apply:

    a. "Act" means the Communications Act of 1934, as amended, 47 U.S.C.
       S: 151 et seq.

    b. "Adopting Order" means an Order of the Bureau adopting the terms of
       this Consent Decree without change, addition, deletion, or
       modification.

    c. "Bureau" means the Enforcement Bureau of the Federal Communications
       Commission.

    d. "Commission" and "FCC" mean the Federal Communications Commission and
       all of its bureaus and offices.

    e. "Compliance Plan" means the program described in this Consent Decree
       at paragraph 9.

    f. "Effective Date" means the date on which the Bureau releases the
       Adopting Order.

    g. "Investigation" means the investigation commenced by the Bureau's
       inspection on January 23, 2010 and followed by the Bureau's May 11,
       2010 letter of inquiry requesting detailed information regarding
       transmissions emanating from NewCom's earth station facility in Miami,
       Florida and the resulting interference.

    h. "NewCom" or the "Company" means NewCom International, Inc. and its
       subsidiaries, affiliates, predecessors-in-interest, and
       successors-in-interest.

    i. "Parties" means NewCom and the Bureau, each of which is a "Party."

    j. "Rules" means the Commission's regulations found in Title 47 of the
       Code of Federal Regulations.

   BACKGROUND

   10. Under Subpart D of Part 25 of the Rules, earth station licensees are
       required to operate their facilities under certain technical
       operational parameters. These rules include the control of a
       transmitting station, general inter-system coordination procedures,
       and particular duties regarding space communications transmissions.

   11. On January 23, 2010, while investigating a complaint of interference,
       the Bureau's Miami Office inspected NewCom's facility in Miami,
       Florida. On May 11, 2010, the Bureau's Miami Office issued the LOI to
       NewCom. The LOI directed NewCom, among other things, to answer
       questions relating to transmissions emanating from NewCom's Miami,
       Florida facility. NewCom responded to the LOI on June 21, 2010, and
       later provided a revised response on June 28, 2010. NewCom and the
       Bureau subsequently entered into settlement discussions.

   TERMS OF AGREEMENT

   12. Adopting Order. The Parties agree that the provisions of this Consent
       Decree shall be subject to final approval by the Bureau by
       incorporation of such provisions by reference in the Adopting Order
       without change, addition, modification, or deletion.

   13. Jurisdiction. NewCom agrees that the Bureau has jurisdiction over it
       and the matters contained in this Consent Decree and has the authority
       to enter into and adopt this Consent Decree.

   14. Effective Date; Violations. The Parties agree that this Consent Decree
       shall become effective on the Effective Date. Upon release, the
       Adopting Order and this Consent Decree shall have the same force and
       effect as any other order of the Bureau. Any violation of the Adopting
       Order or of the terms of this Consent Decree shall constitute a
       separate violation of a Bureau order, entitling the Bureau to exercise
       any rights and remedies attendant to the enforcement of a Commission
       order.

   15. Termination of Investigation. In express reliance on the covenants and
       representations contained herein, and to avoid further expenditure of
       public resources, the Bureau agrees to terminate its Investigation. In
       consideration for the termination of said Investigation, NewCom agrees
       to the terms, conditions, and procedures contained herein. The Bureau
       further agrees that, in the absence of new material evidence, the
       Bureau will not use the facts developed in this Investigation through
       the Effective Date, or the existence of this Consent Decree to
       institute, on its own motion, any new proceeding, formal or informal,
       or take any action on its own motion against NewCom concerning the
       matters that were the subject of the Investigation. The Bureau also
       agrees that in the absence of new material evidence it will not use
       the facts developed in this Investigation through the Effective Date,
       or the existence of this Consent Decree, to institute on its own
       motion any proceeding, formal or informal, or take any action on its
       own motion against NewCom with respect to NewCom's basic
       qualifications, including its character qualifications, to be a
       Commission licensee or authorized common carrier or hold Commission
       authorizations.

   16. Compliance Plan. For purposes of settling the matters set forth
       herein, NewCom agrees to implement a Compliance Plan within sixty (60)
       calendar days of the Effective Date to ensure NewCom's future
       compliance with the Act, the Rules, and the Commission's orders. The
       Compliance Plan shall include, at a minimum, the following components:

    a. Technical Operations Compliance Manual. NewCom shall establish and
       maintain a Technical Operations Compliance Manual within sixty (60)
       calendar days of the Effective Date addressing an earth station
       licensee's responsibilities for general inter-system coordination
       procedures and duties regarding space communications transmissions, as
       detailed below, for use by and distribution to all employees who are
       responsible for such activities.

   i. NewCom's Technical Operations Compliance Manual shall address, at a
   minimum, the Rules governing the general inter-system coordination
   procedures and duties regarding space communications transmissions found
   under Part 25, Subpart D of the Rules. The Technical Operations Compliance
   Manual shall also include information on the potential internal and
   regulatory consequences of failing to comply with NewCom's methods and
   procedures and/or the Rules.

   ii. NewCom shall update and enhance the foregoing Technical Operations
   Compliance Manual regarding the requirements found in subparagraph (i)
   above, as appropriate and necessary.

    b. Technical Operations Training Program. Within ninety (90) calendar
       days of the Effective Date,  NewCom shall establish and maintain a
       Technical Operations Training Program addressing an earth station
       licensee's responsibilities for general inter-system coordination
       procedures and duties regarding space communications transmissions, as
       detailed below, for all employees who are responsible for such
       activities. NewCom's Technical Operations Training Program shall cover
       the topics outlined in the Technical Operations Compliance Manual set
       forth in subparagraph (a) above.

   i. NewCom shall provide the foregoing Technical Operations Training
   Program within ninety (90) calendar days of the Effective Date and will
   update the training at least annually for employees who are responsible
   for such activities. NewCom will also provide training to new employees
   responsible for these activities during those employees' initial training
   period.

   ii. NewCom shall update and enhance the foregoing training regarding an
   earth station licensee's responsibilities for general inter-system
   coordination procedures and duties regarding space communications
   transmissions found under Part 25, Subpart D of the Rules, based on
   changes to the relevant portions of the Act, Rules, and the Commission's
   orders, and as otherwise appropriate.

    c. Compliance Officer. Within thirty (30) calendar days of the Effective
       Date, NewCom shall designate an individual of the Company to serve as
       the Compliance Officer for complying with Part 25, Subpart D of the
       Rules, overseeing the Technical Operations Compliance Manual and
       Technical Operations Compliance Training, and ensuring compliance with
       the Subpart D requirements in the Rules.

    d. Transmitter Control Operator. Within ninety (90) calendar days of the
       Effective Date, and consistent with section 25.271(b) of the Rules,
       NewCom shall ensure that a trained Transmitter Control Operator is
       present on the earth station site, or at a designated remote control
       point, at all times (including weekends) that transmissions are being
       conducted.

    e. Compliance Reports. NewCom will file compliance reports with the
       Commission ninety (90) calendar days after the Effective Date, twelve
       (12) months, and twenty-four (24) months after the Effective Date.
       Each compliance report shall include a certification by the Compliance
       Officer, as an agent of and on behalf of NewCom, stating that the
       Compliance Officer has personal knowledge (i) that NewCom has
       established operating procedures intended to ensure compliance with
       the terms and conditions of this Consent Decree and with Subpart D of
       Part 25 of the Rules, together with an accompanying statement
       explaining the basis for the officer's compliance certification (ii)
       that NewCom has been utilizing those procedures since the previous
       Compliance Report was submitted; and (iii) that NewCom is not aware of
       any instances of non-compliance. The certification must comply with
       section 1.16 of the Rules and be subscribed to as true under penalty
       of perjury in substantially the form set forth therein.  If the
       Compliance Officer cannot provide the requisite certification, the
       Compliance Officer, as an agent of and on behalf of NewCom, shall
       provide the Commission with a detailed explanation of: (i) any
       instances of non-compliance with this Consent Decree and the Rules,
       and (ii) the steps that NewCom has taken or will take to remedy each
       instance of non-compliance and ensure future compliance, and the
       schedule on which proposed remedial actions will be taken. All
       compliance reports shall be submitted to Diane Law-Hsu, South Central
       Region, Enforcement Bureau, Federal Communications Commission, 3575
       Koger Center Blvd Suite 320, Duluth, GA 30096. All reports shall also
       be submitted electronically to SCR-Response@fcc.gov .

    f. Termination Date. The provisions of this paragraph shall remain in
       effect for two (2) years from the Effective Date.

   17. Section 208 Complaints; Subsequent Investigations. Nothing in this
       Consent Decree shall prevent the Commission or its delegated authority
       from adjudicating complaints filed pursuant to section 208 of the Act
       against NewCom or its affiliates for alleged violations of the Act, or
       for any other type of alleged misconduct, regardless of when such
       misconduct took place. The Commission's adjudication of any such
       complaint will be based solely on the record developed in that
       proceeding. Except as expressly provided in this Consent Decree, this
       Consent Decree shall not prevent the Commission from investigating new
       evidence of noncompliance by NewCom of the Act, the rules, or the
       order. Furthermore, this Consent Decree shall not limit or foreclose
       any argument that may be raised by NewCom to respond to or defend
       against any subsequent investigation.

   18. Voluntary Contribution. NewCom agrees that it will make a voluntary
       contribution to the United States Treasury in the amount of thirty
       thousand six hundred dollars ($30,600) in ten equal installments. The
       first contribution of three thousand sixty dollars ($3,060) will be
       made within thirty (30) calendar days after the Effective Date. Each
       successive contribution of three thousand sixty dollars ($3,060) shall
       be due on the first day of the next nine (9) months following the
       initial contribution. Payment must be made by check or similar
       instrument, payable to the order of the Federal Communications
       Commission. The payments must include the Account Number and FRN
       referenced in the caption to the Adopting Order. Payment by check or
       money order may be mailed to Federal Communications Commission, P.O.
       Box 979088, St. Louis, MO 63197-9000. Payment by overnight mail may be
       sent to U.S. Bank - Government Lockbox #979088, SL-MO-C2-GL, 1005
       Convention Plaza, St. Louis, MO 63101. Payment by wire transfer may be
       made to ABA Number 021030004, receiving bank TREAS/NYC, and account
       number 27000001. For payment by credit card, an FCC Form 159
       (Remittance Advice) must be submitted.  When completing the FCC Form
       159, enter the Account number in block number 23A (call sign/other
       ID), and enter the letters "FORF" in block number 24A (payment type
       code). NewCom will also send electronic notification on the date said
       payment is made to SCR-Response@fcc.gov.

   19. Waivers. NewCom waives any and all rights it may have to seek
       administrative or judicial reconsideration, review, appeal, or stay,
       or to otherwise challenge or contest the validity of this Consent
       Decree and the Adopting Order, provided the Bureau issues an Adopting
       Order adopting the Consent Decree without change, addition,
       modification, or deletion. NewCom shall retain the right to challenge
       Commission interpretation of the Consent Decree or any terms contained
       herein. If either Party (or the United States on behalf of the
       Commission) brings a judicial action to enforce the terms of the
       Adopting Order, neither NewCom nor the Commission shall contest the
       validity of the Consent Decree or the Adopting Order, and NewCom shall
       waive any statutory right to a trial de novo. NewCom hereby agrees to
       waive any claims it may otherwise have under the Equal Access to
       Justice Act, 5 U.S.C. S: 504 and 47 C.F.R. S: 1.1501 et seq., relating
       to the matters addressed in this Consent Decree.

   20. Invalidity. In the event that this Consent Decree is rendered invalid
       by a court of competent jurisdiction, it shall become null and void
       and may not be used in any manner in any legal proceeding.

   21. Subsequent Rule or Order. The Parties agree that if any provision of
       the Consent Decree conflicts with any subsequent rule or order adopted
       by the Commission (except an order specifically intended to revise the
       terms of this Consent Decree to which NewCom does not expressly
       consent) that provision will be superseded by such Commission rule or
       order.

   22. Successors and Assigns. NewCom agrees that the provisions of this
       Consent Decree shall be binding on its successors, assigns, and
       transferees.

   23. Final Settlement. The Parties agree and acknowledge that this Consent
       Decree shall constitute a final settlement between the Parties. The
       Parties further agree that this Consent Decree does not constitute
       either an adjudication on the merits or a factual or legal finding or
       determination regarding any compliance or noncompliance with the
       requirements of the Act or the Rules and the Commission's orders.

   24. Modifications. This Consent Decree cannot be modified without the
       advance written consent of both Parties.

   25. Paragraph Headings. The headings of the paragraphs in this Consent
       Decree are inserted for convenience only and are not intended to
       affect the meaning or interpretation of this Consent Decree.

   26. Authorized Representative. Each party represents and warrants to the
       other that it has full power and authority to enter into this Consent
       Decree.

   27. Counterparts. This Consent Decree may be signed in any number of
       counterparts (including by facsimile), each of which, when executed
       and delivered, shall be an original, and all of which counterparts
       together shall constitute one and the same fully executed instrument.


     ________________________________        
                                             
     P. Michele Ellison                      
                                             
     Bureau Chief                            
                                             
     Enforcement Bureau                      
                                             
     ________________________________        
                                             
     Date                                    
                                             
     ________________________________        
                                             
     Jaime Dickinson                         
                                             
     President and Chief Operating Officer   
                                             
     NewCom International, Inc.              
                                             
     ________________________________        
                                             
     Date                                    


   47 C.F.R. S:S: 25.271, 25.272, 25.273.

   47 U.S.C. S:S: 154(i), 503(b).

   47 C.F.R. S:S: 0.111, 0.311.

   See Letter from Steven DeSena, Resident Agent, Miami Office, South Central
   Region, Enforcement Bureau, to NewCom International, Inc. (May 11,
   2010)("LOI").

   47 C.F.R. S: 25.271 - 25.284.

   47 C.F.R. S: 25.271.

   47 C.F.R. S: 25.272.

   47 C.F.R. S: 25.273.

   See LOI, supra n.1.

   Letter from Troy F. Tanner, Counsel to NewCom International, to the
   attention of Steven DeSena, the Miami Resident Agent Office, South Central
   Region, Enforcement Bureau, Federal Communications Commission (June 21,
   2010).

   Letter from Troy F. Tanner, Counsel to NewCom International, to the
   attention of Steven DeSena, the Miami Resident Agent Office, South Central
   Region, Enforcement Bureau, Federal Communications Commission (June 28,
   2010).

   Federal Communications Commission DA 11-101

   Federal Communications Commission DA 11-101