NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Pilgrim Communications ) File No.: EB-FIELDWR-13-00012357 Owner of
Antenna Structure No. 1064204 )
) NOV No.: V201432800014
Gunnison, CO )
NOTICE OF VIOLATION
Released: January 30, 2014
By the District Director, Denver Office, Western Region, Enforcement
Bureau:
1. This is a Notice of Violation (Notice) issued pursuant to Section 1.89
of the Commission's rules (Rules)^ to Pilgrim Communications
(Pilgrim), registrant of antenna structure # 1064204 in Gunnison, CO.
Pursuant to Section 1.89(a) of the Rules, issuance of this Notice does
not preclude the Enforcement Bureau from further action if warranted,
including issuing a Notice of Apparent Liability for Forfeiture for
the violation noted herein.^
2. On November 18, 2013, an agent of the Enforcement Bureau's Denver
Office inspected antenna structure # 1064204 located at 1455 Highway
135, in Gunnison, CO. On November 25, 2013, the agent conducted an
investigation of the information contained in the registration which
revealed the following violation:
a. 47 C.F.R. S 17.57: "The owner of an antenna structure for which an
Antenna Structure Registration Number has been obtained must notify
the Commission within 24 hours of completion of construction (FCC
Form 854-R) and/or dismantlement (FCC Form 854). The owner must also
immediately notify the Commission using FCC Form 854 upon any change
in structure height or change in ownership information." Further
investigation on November 25, 2013, revealed that the phone number
and address provided in the Antenna Structure Registration database
for structure 1233212 were no longer valid.
3. Pursuant to Section 403 of the Communications Act of 1934, as
amended,^ and Section 1.89 of the Rules, we seek additional
information concerning the violations and any remedial actions taken.
Therefore, Pilgrim must submit a written statement concerning this
matter within twenty (20) days of release of this Notice. The response
(i) must fully explain each violation, including all relevant
surrounding facts and circumstances, (ii) must contain a statement of
the specific action(s) taken to correct each violation and preclude
recurrence, and (iii) must include a time line for completion of any
pending corrective action(s). The response must be complete in itself
and must not be abbreviated by reference to other communications or
answers to other notices.^
4. In accordance with Section 1.16 of the Rules, we direct Pilgrim to
support its response to this Notice with an affidavit or declaration
under penalty of perjury, signed and dated by an authorized officer of
Pilgrim with personal knowledge of the representations provided in
Pilgrim's response, verifying the truth and accuracy of the
information therein,^ and confirming that all of the information
requested by this Notice which is in the licensee's possession,
custody, control, or knowledge has been produced. To knowingly and
willfully make any false statement or conceal any material fact in
reply to this Notice is punishable by fine or imprisonment under Title
18 of the U.S. Code.^
5. All replies and documentation sent in response to this Notice should
be marked with the File No. and NOV No. specified above, and mailed to
the following address:
Federal Communications Commission
Denver Office
P.O. Box 25446
One Denver Federal Center - Building 1A
Lakewood, CO 80225
6. This Notice shall be sent to Pilgrim Communications at its address of
record.
7. The Privacy Act of 1974^ requires that we advise you that the
Commission will use all relevant material information before it,
including any information disclosed in your reply, to determine what,
if any, enforcement action is required to ensure compliance.
FEDERAL COMMUNICATIONS COMMISSION
Nikki P. Shears
District Director
Denver Office
Western Region
Enforcement Bureau
^ 47 C.F.R. S 1.89.
^ 47 C.F.R. S 1.89(a).
^ 47 U.S.C. S 403.
^ 47 C.F.R. S 1.89(c).
^ Section 1.16 of the Rules provides that "[a]ny document to be filed with
the Federal Communications Commission and which is required by any law,
rule or other regulation of the United States to be supported, evidenced,
established or proved by a written sworn declaration, verification,
certificate, statement, oath or affidavit by the person making the same,
may be supported, evidenced, established or proved by the unsworn
declaration, certification, verification, or statement in writing of such
person . . . . Such declaration shall be subscribed by the declarant as
true under penalty of perjury, and dated, in substantially the following
form . . . : `I declare (or certify, verify, or state) under penalty of
perjury that the foregoing is true and correct. Executed on (date).
(Signature)'." 47 C.F.R. S 1.16.
^ 18 U.S.C. S 1001 et seq. See also 47 C.F.R. S 1.17.
^ P.L. 93-579, 5 U.S.C. S 552a(e)(3).
Federal Communications Commission
2
Federal Communications Commission