Click here for Adobe Acrobat version
Click here for Microsoft Word version
********************************************************
NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Pennsylvania Turnpike Commission ) File No.: [1]EB-FIELDNER-14-00012989
)
Owner of Antenna Structure No. 1217017 ) NOV No.: V201432400011
)
New Cumberland, Pennsylvania )
)
NOTICE OF VIOLATION
Released: January 16, 2014
By the District Director, Philadelphia Office, Northeast Region,
Enforcement Bureau:
1. This is a Notice of Violation (Notice) issued pursuant to Section 1.89
of the Commission's rules (Rules)^ to the Pennsylvania Turnpike
Commission (PTC), owner of antenna structure number 1217017 in New
Cumberland, Pennsylvania. Pursuant to Section 1.89(a) of the Rules,
issuance of this Notice does not preclude the Enforcement Bureau from
further action if warranted, including issuing a Notice of Apparent
Liability for Forfeiture for the violation noted herein.^
2. On December 20, 2013, agents of the Enforcement Bureau's Philadelphia
Office inspected antenna structure number 1217017 located at the
Harrisburg West Interchange of the Pennsylvania Turnpike in New
Cumberland, Pennsylvania and observed the following violations:
a. 47 C.F.R. S 17.23: "Unless otherwise specified by the Commission,
each new or altered antenna structure to be registered on or after
January 1, 1996, must conform to the FAA's painting and lighting
recommendations set forth on the structure's FAA determination of "no
hazard,"...." Antenna structure 1217017 is required to have paint and
red obstruction lighting in accordance with Chapters 3, 4, 5, and 13
of FAA Circular 70/7460-1J. The agents observed that the antenna
structure was not painted and that there were no obstruction lights
installed on the antenna structure.
b. 47 C.F.R. S 17.57: "The owner of an antenna structure for which an
Antenna Structure Registration Number has been obtained must ...
immediately notify the Commission using FCC Form 854 upon any change
in structure height or change in ownership information." The PTC
failed to notify the Commission of a change in overall height above
ground level of antenna structure 1217017. The Antenna Structure
Registration specifies that the overall height of antenna structure
1217017 is 13.7 meters (44.9 feet) above ground level. During the
inspection, agents determined that the overall height of the antenna
structure is currently 10.6 meters (35 feet).
3. Pursuant to Section 403 of the Communications Act of 1934, as
amended,^ and Section 1.89 of the Rules, we seek additional
information concerning the violations and any remedial actions taken.
Therefore, PTC must submit a written statement concerning this matter
within twenty (20) days of release of this Notice. The response (i)
must fully explain each violation, including all relevant surrounding
facts and circumstances, (ii) must contain a statement of the specific
action(s) taken to correct each violation and preclude recurrence, and
(iii) must include a time line for completion of any pending
corrective action(s). The response must be complete in itself and
must not be abbreviated by reference to other communications or
answers to other notices.^
4. In accordance with Section 1.16 of the Rules, we direct the PTC to
support its response to this Notice with an affidavit or declaration
under penalty of perjury, signed and dated by an authorized officer of
the PTC with personal knowledge of the representations provided in
PTC's response, verifying the truth and accuracy of the information
therein,^ and confirming that all of the information requested by this
Notice which is in the regulatee's possession, custody, control, or
knowledge has been produced. To knowingly and willfully make any false
statement or conceal any material fact in reply to this Notice is
punishable by fine or imprisonment under Title 18 of the U.S. Code.^
5. All replies and documentation sent in response to this Notice should
be marked with the File No. and NOV No. specified above, and mailed to
the following address:
Federal Communications Commission
Philadelphia Office
One Oxford Valley Building, Suite 404
2300 East Lincoln Highway
Langhorne, Pennsylvania 19047
6. This Notice shall be sent to the Pennsylvania Turnpike Commission at
its address of record.
7. The Privacy Act of 1974^ requires that we advise you that the
Commission will use all relevant material information before it,
including any information disclosed in your reply, to determine what,
if any, enforcement action is required to ensure compliance.
FEDERAL COMMUNICATIONS COMMISSION
David C. Dombrowski
District Director
Philadelphia Office
Northeast Region
Enforcement Bureau
^ 47 C.F.R. S 1.89.
^ 47 C.F.R. S 1.89(a).
^ 47 U.S.C. S 403.
^ 47 C.F.R. S 1.89(c).
^ Section 1.16 of the Rules provides that "[a]ny document to be filed with
the Federal Communications Commission and which is required by any law,
rule or other regulation of the United States to be supported, evidenced,
established or proved by a written sworn declaration, verification,
certificate, statement, oath or affidavit by the person making the same,
may be supported, evidenced, established or proved by the unsworn
declaration, certification, verification, or statement in writing of such
person . . . . Such declaration shall be subscribed by the declarant as
true under penalty of perjury, and dated, in substantially the following
form . . . : `I declare (or certify, verify, or state) under penalty of
perjury that the foregoing is true and correct. Executed on (date).
(Signature)'." 47 C.F.R. S 1.16.
^ 18 U.S.C. S 1001 et seq. See also 47 C.F.R. S 1.17.
^ P.L. 93-579, 5 U.S.C. S 552a(e)(3).
Federal Communications Commission
3
Federal Communications Commission
References
Visible links
1. https://ebats.fcc.gov/ebats/overview%21openCase.action?case_id=EB-FIELDNER-14-00012989&case_type=S