Click here for Adobe Acrobat version
Click here for Microsoft Word version
******************************************************** 
                      NOTICE
********************************************************

This document was converted from Microsoft Word.

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************




                                   Before the

                       Federal Communications Commission

                             Washington, D.C. 20554

   In the Matter of )

   )

   East River Electric Power Cooperative, Inc. ) File No.:
   EB-FIELDWR-13-00010398 Owner of Antenna Structure No. 1041658  )

   ) NOV No.: V201332800063

   Willow Lake, SD )

                              NOTICE OF VIOLATION

   Released: September 12, 2013

   By the District Director, Denver District Office, Western Region,
   Enforcement Bureau:

    1. This is a Notice of Violation (Notice) issued pursuant to Section 1.89
       of the Commission's rules (Rules)^ to East River Electric Power
       Cooperative, Inc. (EREPCI), registrant of Antenna Structure # 1041658
       by Willow Lake, SD. Pursuant to Section 1.89(a) of the Rules, issuance
       of this Notice does not preclude the Enforcement Bureau from further
       action if warranted, including issuing a Notice of Apparent Liability
       for Forfeiture for the violations noted herein.^

    2. On July 31, 2013, an agent of the Enforcement Bureau's Denver District
       Office inspected Antenna Structure # 1041658, located approximately
       3.5 miles southwest of Willow Lake, SD, and observed the following
       violations:

     a. 47 C.F.R. S 17.23: "Unless otherwise specified by the Commission,
        each new or altered antenna structure to be registered on or after
        January 1, 1996, must conform to the FAA's painting and lighting
        recommendations set forth on the structure's FAA determination of "no
        hazard,"..." The FAA recommended that the tower be painted and lit in
        accordance with FAA Circular 70/7460-1G, Chapters 3, 4, 5, and 9.
        Chapter 3 requires that the tower be painted and Chapter 5 requires
        that the tower have four levels of red lights. At the time of the
        inspection, the agent observed that the tower had only two levels of
        lights installed and these were flashing white.

     b. 47 C.F.R. S 17.50: "Antenna structures requiring painting under this
        part shall be cleaned or repainted as often as necessary to maintain
        good visibility." As mentioned above, the FAA recommended that the
        tower be painted. At the time of the inspection, the agent observed
        that the tower was not painted.

    3. Pursuant to Section 403 of the Communications Act of 1934, as
       amended,^ and Section 1.89 of the Rules, we seek additional
       information concerning the violations and any remedial actions taken.
       Therefore, EREPCI must submit a written statement concerning this
       matter within twenty (20) days of release of this Notice. The response
       (i) must fully explain each violation, including all relevant
       surrounding facts and circumstances, (ii) must contain a statement of
       the specific action(s) taken to correct each violation and preclude
       recurrence, and (iii) must include a time line for completion of any
       pending corrective action(s). The response must be complete in itself
       and must not be abbreviated by reference to other communications or
       answers to other notices.^

    4. In accordance with Section 1.16 of the Rules, we direct EREPCI to
       support its response to this Notice with an affidavit or declaration
       under penalty of perjury, signed and dated by an authorized officer of
       EREPCI with personal knowledge of the representations provided in
       EREPCI's response, verifying the truth and accuracy of the information
       therein,^ and confirming that all of the information requested by this
       Notice which is in the licensee's possession, custody, control, or
       knowledge has been produced. To knowingly and willfully make any false
       statement or conceal any material fact in reply to this Notice is
       punishable by fine or imprisonment under Title 18 of the U.S. Code.^

    5. All replies and documentation sent in response to this Notice should
       be marked with the File No. and NOV No. specified above, and mailed to
       the following address:

   Federal Communications Commission

   Denver District Office

   215 S. Wadsworth Blvd., Suite 303

   Lakewood, CO 80226

    6. This Notice shall be sent to East River Electric Power Cooperative,
       Inc. at its address of record.

    7. The Privacy Act of 1974^ requires that we advise you that the
       Commission will use all relevant material information before it,
       including any information disclosed in your reply, to determine what,
       if any, enforcement action is required to ensure compliance.

   FEDERAL COMMUNICATIONS COMMISSION

   Nikki P. Shears

   District Director

   Denver District Office

   Western Region

   Enforcement Bureau

   ^ 47 C.F.R. S 1.89.

   ^ 47 C.F.R. S 1.89(a).

   ^ 47 U.S.C. S 403.

   ^ 47 C.F.R. S 1.89(c).

   ^ Section 1.16 of the Rules provides that "[a]ny document to be filed with
   the Federal Communications Commission and which is required by any law,
   rule or other regulation of the United States to be supported, evidenced,
   established or proved by a written sworn declaration, verification,
   certificate, statement, oath or affidavit by the person making the same,
   may be supported, evidenced, established or proved by the unsworn
   declaration, certification, verification, or statement in writing of such
   person . . . . Such declaration shall be subscribed by the declarant as
   true under penalty of perjury, and dated, in substantially the following
   form . . . : `I declare (or certify, verify, or state) under penalty of
   perjury that the foregoing is true and correct. Executed on (date).
   (Signature)'." 47 C.F.R. S 1.16.

   ^ 18 U.S.C. S 1001 et seq. See also 47 C.F.R. S 1.17.

   ^ P.L. 93-579, 5 U.S.C. S 552a(e)(3).

   Federal Communications Commission

   1

   3

                       Federal Communications Commission