NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Central Electric Power Cooperative ) File No.: EB-FIELDSCR-13-00008123
Owner of Antenna Structure No. 1003945 ) NOV No.: V201332560022
Sedalia, MO )
NOTICE OF VIOLATION
Released: April 29, 2013
By the District Director, Kansas City Office, South Central Region,
Enforcement Bureau:
1. This is a Notice of Violation (Notice) issued pursuant to Section 1.89
of the Commission's rules (Rules)^ to Central Electric Power
Cooperative (Central Electric), owner of antenna structure number
1003945 in Sedalia, Missouri. Pursuant to Section 1.89(a) of the
Rules, issuance of this Notice does not preclude the Enforcement
Bureau from further action if warranted, including issuing a Notice of
Apparent Liability for Forfeiture for the violation(s) noted herein.^
2. On April 19, 2013, an agent of the Enforcement Bureau's Kansas City
Office inspected antenna structure number 1003945 in Sedalia,
Missouri, and observed the following violation(s):
a. 47 C.F.R. S 17.50: "Antenna structures requiring painting under
this part shall be cleaned or repainted as often as necessary to
maintain good visibility." At the time of inspection, the paint on
this structure was faded and its visibility to aircraft was reduced.
3. Pursuant to Section 403 of the Communications Act of 1934, as
amended,^ and Section 1.89 of the Rules, we seek additional
information concerning the violations and any remedial actions taken.
Therefore, Central Electric must submit a written statement concerning
this matter within twenty (20) days of release of this Notice. The
response (i) must fully explain each violation, including all relevant
surrounding facts and circumstances, (ii) must contain a statement of
the specific action(s) taken to correct each violation and preclude
recurrence, and (iii) must include a time line for completion of any
pending corrective action(s). The response must be complete in itself
and must not be abbreviated by reference to other communications or
answers to other notices.^
4. In accordance with Section 1.16 of the Rules, we direct Central
Electric to support its response to this Notice with an affidavit or
declaration under penalty of perjury, signed and dated by an
authorized officer of Central Electric with personal knowledge of the
representations provided in Central Electric's response, verifying
the truth and accuracy of the information therein,^ and confirming
that all of the information requested by this Notice which is in the
licensee's possession, custody, control, or knowledge has been
produced. To knowingly and willfully make any false statement or
conceal any material fact in reply to this Notice is punishable by
fine or imprisonment under Title 18 of the U.S. Code.^
5. All replies and documentation sent in response to this Notice should
be marked with the File No. and NOV No. specified above, and mailed to
the following address:
Federal Communications Commission
Kansas City Office
520 NE Colbern Rd.
Lee's Summit, MO 64086
6. This Notice shall be sent to Central Electric at its address of
record.
7. The Privacy Act of 1974^ requires that we advise you that the
Commission will use all relevant material information before it,
including any information disclosed in your reply, to determine what,
if any, enforcement action is required to ensure compliance.
FEDERAL COMMUNICATIONS COMMISSION
Ronald D. Ramage
District Director
Kansas City District Office
South Central Region
Enforcement Bureau
^ 47 C.F.R. S 1.89.
^ 47 C.F.R. S 1.89(a).
^ 47 U.S.C. S 403.
^ 47 C.F.R. S 1.89(c).
^ Section 1.16 of the Rules provides that "[a]ny document to be filed with
the Federal Communications Commission and which is required by any law,
rule or other regulation of the United States to be supported, evidenced,
established or proved by a written sworn declaration, verification,
certificate, statement, oath or affidavit by the person making the same,
may be supported, evidenced, established or proved by the unsworn
declaration, certification, verification, or statement in writing of such
person . . . . Such declaration shall be subscribed by the declarant as
true under penalty of perjury, and dated, in substantially the following
form . . . : `I declare (or certify, verify, or state) under penalty of
perjury that the foregoing is true and correct. Executed on (date).
(Signature)'." 47 C.F.R. S 1.16.
^ 18 U.S.C. S 1001 et seq. See also 47 C.F.R. S 1.17.
^ P.L. 93-579, 5 U.S.C. S 552a(e)(3).