Click here for Adobe Acrobat version
Click here for Microsoft Word version
******************************************************** 
                      NOTICE
********************************************************

This document was converted from Microsoft Word.

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************




                                   Before the

                       Federal Communications Commission

                             Washington, D.C. 20554

   In the Matter of )

   )

   MBC Grand Broadcasting, Inc. ) File No. EB-10-DV-0042

   Antenna Structure Registrant )

   ASR # 1060414 )

   Glenwood Springs, Colorado ) NOV No. V201032800021

   )

                              NOTICE OF VIOLATION

   Released: April 20, 2010

   By the District Director, Denver Office, Western Region, Enforcement
   Bureau:

    1. This is a Notice of Violation ("Notice") issued pursuant to Section
       1.89 of the Commission's Rules, to MBC Grand Broadcasting, Inc.
       ("MBC"), registrant of antenna structure #1060414 in Glenwood Springs,
       Colorado.

    2. On April 1, 2010, an agent of the Enforcement Bureau's Denver Office
       inspected antenna structure #1060414 located in Glenwood Springs,
       Colorado, and observed the following violations:

     a. 47 C.F.R. S: 17.51(a): "All red obstruction lighting shall be
        exhibited from sunset to sunrise unless otherwise specified." At the
        time of inspection, two sidelights were extinguished at the one-third
        level and one sidelight was extinguished at the two-thirds level on
        antenna structure #1060414.

     b. 47 C.F.R. S: 17.21: "Antenna structures shall be painted and lighted
        when (a) They exceed 60.96 meters (200 feet) in height above the
        ground or they require special aeronautical study." The painting and
        lighting specifications for antenna structure #1060414 are listed as
        FCC paragraphs 1, 3, 11, and 21. Paragraph 11 requires that the
        structure have sidelights with at least two red obstruction lights
        installed at its mid point. At the time of inspection, the antenna
        structure had red obstruction lights installed at one third and
        two-thirds levels of the overall height of the structure. The
        sidelights were not installed in accordance with its associated FCC
        antenna structure registration.

    3. Pursuant to Section 403 of the Communications Act of 1934, as amended,
       and Section 1.89 of the Commission's Rules, MBC must submit a written
       statement concerning this matter within 20 days of release of this
       Notice. The response must fully explain each violation, must contain a
       statement of the specific action(s) taken to correct each violation
       and preclude recurrence, and should include a time line for completion
       of pending corrective action(s). The response must be complete in
       itself and signed by a principal or officer of the MBC. All replies
       and documentation sent in response to this Notice should be marked
       with the File No. and NOV No. specified above, and mailed to the
       following address:

   Federal Communications Commission

   Denver District Office

   215 S. Wadsworth Blvd., Suite 303

   Lakewood, Colorado 80226

    4. This Notice shall be sent to MBC Grand Broadcasting, Inc., at its
       address of record.

    5. The Privacy Act of 1974 requires that we advise you that the
       Commission will use all relevant material information before it,
       including any information disclosed in your reply, to determine what,
       if any, enforcement action is required to ensure compliance. Any false
       statement made knowingly and willfully in reply to this Notice is
       punishable by fine or imprisonment under Title 18 of the U.S. Code.

   FEDERAL COMMUNICATIONS COMMISSION

   Nikki P. Shears

   District Director

   Denver District Office

   Western Region

   Enforcement Bureau

   47 C.F.R. S: 1.89.

   47 U.S.C. S: 403.

   P.L. 93-579, 5 U.S.C. S: 552a(e)(3).

   18 U.S.C. S: 1001 et seq.

   Federal Communications Commission

   2

                       Federal Communications Commission