Click here for Adobe Acrobat version
Click here for Microsoft Word version
******************************************************** 
                      NOTICE
********************************************************

This document was converted from Microsoft Word.

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************




                                   Before the

                       Federal Communications Commission

                             Washington, D.C. 20554

   In the Matter of )

   )

   Cablevision of New York City ) File No. EB-10-NY-0020

   Physical System ID # 013008 )

   Bronx, New York ) NOV No. V201032380008

   )

                              NOTICE OF VIOLATION

   Released: January 27, 2010

   By the District Director, New York Office, Northeast Region, Enforcement
   Bureau:

    1. This is a Notice of Violation ("Notice") issued pursuant to Section
       1.89 of the Commission's Rules, to Cablevision of New York City
       ("Cablevision"), operator of a cable system in Bronx, New York.

    2. On January 25, 2010, an agent of the Enforcement Bureau's New York
       Office monitored Cablevision's system in Bronx, New York, and observed
       the following violation:

   47 C.F.R. S: 76.605(a)(12): "As an exception to the general provision
   requiring measurements to be made at subscriber terminals, and without
   regard to the type of signals carried by the cable television system,
   signal leakage from a cable television system shall be measured in
   accordance with the procedures outlined in S: 76.609(h) and shall be
   limited as follows: Less than and including 54 MHz, and over 216 MHz - 15
   micro-volts per meter, measured at 30 meters." At the

   time of the investigation, the agent observed signal leakage at the
   following location:


                  Frequency   Field Intensity                                
        Date                                             Location            
                    (MHz)         (uV/m)                                     

                                                   630 E220 Street near      
     01/25/2010    127.26           154          Carpenter Avenue, Bronx,    
                                                         New York            


    3. Pursuant to Section 403 of the Communications Act of 1934, as amended,
       and Section 1.89 of the Commission's Rules, must submit a written
       statement concerning this matter within 20 days of release of this
       Notice. The response must fully explain each violation, must contain a
       statement of the specific action(s) taken to correct each violation
       and preclude recurrence, and should include a time line for completion
       of pending corrective action(s). The response must be complete in
       itself and signed by a principal or officer of Cablevision. All
       replies and documentation sent in response to this Notice should be
       marked with the File No. and NOV No. specified above, and mailed to
       the following address:

   Federal Communications Commission

   New York District Office

   201 Varick Street, Suite 1151

   New York, New York 10014

    4. This Notice shall be sent by to Cablevision of New York City at its
       address of record.

    5. The Privacy Act of 1974 requires that we advise you that the
       Commission will use all relevant material information before it,
       including any information disclosed in your reply, to determine what,
       if any, enforcement action is required to ensure compliance. Any false
       statement made

   knowingly and willfully in reply to this Notice is punishable by fine or
   imprisonment under Title 18 of the U.S. Code.

   FEDERAL COMMUNICATIONS COMMISSION

   Daniel W. Noel

   District Director

   New York District Office

   Northeast Region

   Enforcement Bureau

   47 C.F.R. S: 1.89.

   47 U.S.C. S: 403.

   P.L. 93-579, 5 U.S.C. S: 552a(e)(3).

   18 U.S.C. S: 1001 et seq.

   Federal Communications Commission

   2

                       Federal Communications Commission