Click here for Adobe Acrobat version
Click here for Microsoft Word version
********************************************************
NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
NPG Cable, Inc. ) File No. EB-08-SD-0103
Physical System ID # 006155 )
Kingman, Arizona )
) NOV No. V200832940014
)
NOTICE OF VIOLATION
Released: April 8, 2008
By the District Director, San Diego Office, Western Region, Enforcement
Bureau:
1. This is a Notice of Violation ("Notice") issued pursuant to Section
1.89 of the Commission's Rules, to NPG Cable, Inc., operator of a
cable system serving Kingman, Arizona.
2. On March 25, 2008, an agent of the Enforcement Bureau's San Diego
Office inspected NPG Cable, Inc.' emergency alert system ("EAS"),
located at 2900 Airway Avenue, Kingman, Arizona, and observed the
following violation:
a. 47 C.F.R. S:11.61(b): "Entries shall be made in EAS Participant
records, as specified in Sections 11.35(a) and 11.54(b)(13)." NPG Cable,
Inc.'s EAS records do not indicate that the required monthly test ("RMT")
for the months of May, August, September and December of 2007 were
conducted. There were no notes recorded as to why the cable system did
not receive the required weekly test ("RWT") or the required monthly tests
("RMT") from the second local primary (LP-2) station, KNLB(FM) - Lake
Havasu City, Arizona, from January, 2007 to the present. Further, there
were no records of EAS equipment inspections and if those inspections
revealed any equipment malfunctions.
3. Pursuant to Section 403 of the Communications Act of 1934, as amended,
and Section 1.89 of the Commission's Rules, NPG Cable, Inc. must
submit a written statement concerning this matter within 20 days of
release of this Notice. The response must fully explain each
violation, must contain a statement of the specific action(s) taken to
correct each violation and preclude recurrence, and should include a
time line for completion of pending corrective action(s). The response
must be complete in itself and signed by a principal or officer of NPG
Cable, Inc. All replies and documentation sent in response to this
Notice should be marked with the File No. and NOV No. specified above,
and mailed to the following address:
Federal Communications Commission
San Diego District Office
4542 Ruffner Street, Suite 370
San Diego, CA 92111
4. This Notice shall be sent to by Certified Mail/Return Receipt
Requested and regular mail to NPG Cable, Inc., at its address of
record.
5. The Privacy Act of 1974 requires that we advise you that the
Commission will use all relevant material information before it,
including any information disclosed in your reply, to determine what,
if any, enforcement action is required to ensure compliance. Any false
statement made knowingly and willfully in reply to this Notice is
punishable by fine or imprisonment under Title 18 of the U.S. Code.
FEDERAL COMMUNICATIONS COMMISSION
William R. Zears Jr.
District Director
San Diego District Office
Western Region
Enforcement Bureau
cc: NPG Cable, Inc, AZ
2900 Airway Avenue
Kingman, AZ 86401
47 C.F.R. S: 1.89.
47 U.S.C. S: 403.
P.L. 93-579, 5 U.S.C. S: 552a(e)(3).
18 U.S.C. S: 1001 et seq.
Federal Communications Commission
2
Federal Communications Commission