Click here for Adobe Acrobat version
Click here for Microsoft Word version
******************************************************** 
                      NOTICE
********************************************************

This document was converted from Microsoft Word.

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************




                         Before the
              Federal Communications Commission
                   Washington, D.C. 20554


In the Matter of                 )
                                 )
Get Real Cable, LLC              )         File No. EB-05-
DL-038
Operator of Cable Television System        )
Physical System ID # 016681      )         NOV           No.  
V20053250011
Blackwell, Oklahoma              )
                                 
                     NOTICE OF VIOLATION
                                    Released: April 19, 2005

By the District Director, Dallas Office, South Central 
Region, Enforcement Bureau:

   1.     This is a Notice of Violation ("Notice") issued 
     pursuant to Section 1.89 of the Commission's Rules,1 to 
     Get Real Cable, LLC., operator of cable television 
     system serving Blackwell, Oklahoma.

   2.     On March 4, 2005, an agent of the Commission's 
     Dallas Office inspected the cable television system 
     located in Blackwell, Oklahoma, and observed the 
     following violation:

         47 C.F.R. § 11.35(a): ``...cable systems...are 
        responsible for ensuring that EAS Encoders, EAS 
        Decoders and Attention Signal generating and 
        receiving equipment used as part of the EAS are 
        installed so that the monitoring and 
        transmitting functions are available during the 
        times the...systems are in operation.''  At the 
        time of inspection, Get Real Cable, LLC 
        personnel stated that the EAS equipment at 
        their cable headend was damaged by power spikes 
        during an ice storm and had not been replaced 
        since failing during May 2002.

   3.     Pursuant to Section 308(b) of the Communications 
     Act of 1934, as amended,2 and Section 1.89 of the 
     Commission's Rules, Get Real Cable, LLC., must submit a 
     written statement concerning this matter within twenty 
     (20) days of release of this Notice.  The response must 
     fully explain each violation, must contain a statement 
     of the specific action(s) taken to correct each 
     violation and preclude recurrence, and should include a 
     time line for completion of pending corrective 
     action(s).  The response must be complete in itself and 
     signed by a principal or officer of the licensee.  All 
     replies and documentation sent in response to this 
     Notice should be marked with the File No. and NOV No. 
     specified above, and mailed to the following address:

                  Federal Communications Commission
                  Dallas Office
                  9330 LBJ Freeway, Suite 1170
                  Dallas, TX 75243

   4.     This Notice shall be sent to Get Real Cable, LLC. 
     at its address of record.

   5.     The Privacy Act of 19743 requires that we advise 
     you that the Commission will use all relevant material 
     information before it, including any information 
     disclosed in your reply, to determine what, if any, 
     enforcement action is required to ensure compliance.  
     Any false statement made knowingly and willfully in 
     reply to this Notice is punishable by fine or 
     imprisonment under Title 18 of the U.S. Code.4

                            FEDERAL COMMUNICATIONS 
COMMISSION


                            Jerry M. Montgomery
                            Acting District Director
                            Dallas District Office
                            South Central Region
                            Enforcement Bureau

_________________________

147 C.F.R. § 1.89.

247 U.S.C. § 308(b).
3P.L. 93-579, 5 U.S.C. § 552a(e)(3).
418 U.S.C. § 1001 et seq.