Click here for Adobe Acrobat version
Click here for Microsoft Word version
********************************************************
NOTICE
********************************************************
This document was converted from Microsoft Word.
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Galaxy Cablevision ) File No. EB-05-
OR-016
Operator of Cable Television System )
Physical System ID # 011106 ) NOV No.
V20053262005
Poplarville, Mississippi )
NOTICE OF VIOLATION
Released: February 7, 2005
By the District Director, New Orleans Office, South Central
Region, Enforcement Bureau:
1. This is a Notice of Violation ("Notice") issued
pursuant to Section 1.89 of the Commission's Rules,1 to
Galaxy Cablevision, operator of cable television system
serving Poplarville, Mississippi.
2. On February 3, 2005, an agent of the Commission's
New Orleans Office inspected cable television system
located in Poplarville, Mississippi, and observed the
following violation:
2.a. 47 C.F.R. § 76.605(a)(12):
``...signal leakage from a cable
television system shall be
measured...and shall be limited as
follows:'' This section requires
that cable operators maintain their
cable system signal leakage below 20
µV/m measured at 3 meters in the
frequency band between 54 MHz and 216
MHz. Signal leakage in excess of 20
µV/m was measured on 133.2625 MHz at
the following location(s).
Signal Level Location
(µV/m)
184 Pole on left side in front
of 104 Camelia Dr.
275 Pole across street from
intersection of N. Columbia
St. and W. Oak St.
159 Pole on W. Pearl St. and S.
Pine St.
71 Pole behind Emergency
Management Center on N.
Main St.
141 Pole 209 on W. Church St.
(next to school)
3. Pursuant to Section 308(b) of the Communications
Act of 1934, as amended,2 and Section 1.89 of the
Commission's Rules, Galaxy Cablevision, must submit a
written statement concerning this matter within twenty
(20) days of release of this Notice. The response must
fully explain each violation, must contain a statement
of the specific action(s) taken to correct each
violation and preclude recurrence, and should include a
time line for completion of pending corrective
action(s). The response must be complete in itself and
signed by a principal or officer of the licensee. All
replies and documentation sent in response to this
Notice should be marked with the File No. and NOV No.
specified above, and mailed to the following address:
Federal Communications Commission
New Orleans Office
2424 Edenborn Ave., Suite 460
Metairie, LA 70001
4. This Notice shall be sent to Galaxy Cablevision at
its address of record.
5. The Privacy Act of 19743 requires that we advise
you that the Commission will use all relevant material
information before it, including any information
disclosed in your reply, to determine what, if any,
enforcement action is required to ensure compliance.
Any false statement made knowingly and willfully in
reply to this Notice is punishable by fine or
imprisonment under Title 18 of the U.S. Code.4
FEDERAL COMMUNICATIONS
COMMISSION
James C. Hawkins
District Director
New Orleans District Office
South Central Region
Enforcement Bureau
_________________________
147 C.F.R. § 1.89.
247 U.S.C. § 308(b).
3P.L. 93-579, 5 U.S.C. § 552a(e)(3).
418 U.S.C. § 1001 et seq.